Renovation of School Main Hall was one of the main building projects undertaken to celebrate the 50th Anniversary of the school. The aged building was indeed expecting such an outlook to welcome the 50th year at grandeur of gratitude.
Main contract works included, surface preparation and painting of floor, walls (both internal and external) and ceiling, construction of the pavement in main pathway with steel grating and concrete drains and painting of gutters and downpipes. Ceiling sheets which were warped and damaged have been replaced with new sheets to achieve an even surface, and entire electrical lines been repaired with new light bulbs and sockets. New LED panel lights were introduced to the entire ceiling replacing the damaged and corroded Fluorescent light panels.
Industrial Heavy Duty Wall Fans were introduced replacing the deteriorated ordinary wall fans for the main seating area, in order to meet up the most technically, economically and durability terms. Wall mounted fans in the stage area were repaired and ordinary ceiling mounted fan was introduced to the changing room. Corroded seating stands were repainted and the Control room was given a cover with new curtains. Stage curtains were taken a new look with its laundering and shampooing, and at the same time the name boards on either sides were mounted with Acrylic Name tags. The photos of Past Principals were remounted with new frames.
Main contract works included, surface preparation and painting of floor, walls (both internal and external) and ceiling, construction of the pavement in main pathway with steel grating and concrete drains and painting of gutters and downpipes. Ceiling sheets which were warped and damaged have been replaced with new sheets to achieve an even surface, and entire electrical lines been repaired with new light bulbs and sockets. New LED panel lights were introduced to the entire ceiling replacing the damaged and corroded Fluorescent light panels.
Industrial Heavy Duty Wall Fans were introduced replacing the deteriorated ordinary wall fans for the main seating area, in order to meet up the most technically, economically and durability terms. Wall mounted fans in the stage area were repaired and ordinary ceiling mounted fan was introduced to the changing room. Corroded seating stands were repainted and the Control room was given a cover with new curtains. Stage curtains were taken a new look with its laundering and shampooing, and at the same time the name boards on either sides were mounted with Acrylic Name tags. The photos of Past Principals were remounted with new frames.